Honea Heights Improvements: Client-Town of Marana

This project is three different projects in one. In Honea Heights neighborhood we are to replace an existing 4" water main in an alley and regrade and pave the streets. The third is a 8" water main connecting two water systems together.

The scope of our work is.

  •  2" By Pass Water System
  •  4" Water Main Replacement
  •  Header Curb
  •  Grade and Pave Existing Streets
  •  8" Sewer Line with Four House Services
  •  8" PVC Water Main

Project Manager Terry Marshall. Project Engineer Travis Whelan. Project Superintendent Bobby Darby. Utility Foreman Henry Larson. Concrete Foreman Freddie Molina. Asphalt Foreman Julio Santa Cruz.


Popup Barriers: Client-Davis-Monthan Air Force Base

This project is to add additional Popup Barriers to the outbound lanes at the 3 entrances to DMAFB.

The scope of our work is.

  •  Install remote controlled  Popup Barriers capable of stopping large trucks 
  •  Remote controlled Tiger Teeth Stop Strips
  •  Several hundred tons of very large boulders
  •  Warning signals
  • Curbing
  • Roadway widening asphalt paving

Project Manager D. Allen Sheppard. Project Engineer Travis Whelan. Project Superintendent TBA. Concrete Foreman TBA.

Asphalt Foreman Julio Santa Cruz.


Multi Use Path Canada Del Oro Wash: Client-Town of Oro Valley

The scope of our work is.                                                                                             

  •  Earthwork Grading -
  •  Storm Water Pollution Control/Maintenance
  •  3 Pedestrian Bridges
  •  Soil Cement Bank Protection
  •  Curbing
  •  Asphalt Paved Path

Project Manager Brett Fischer. Project Engineer Jeff Kurtin. Project Superintendent Cory Hejl.

Concrete Structure Foreman Bill Wright and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.


La Canada Drive Road Widening: Client-Town of Oro Valley

The scope of our work is.                                                                                             

  •  Earthwork Grading - Widen La Canada Dr. from Naranja Drive to Tangerine Road
  •  Storm Water Pollution Control/Maintenance
  •  Storm Water Drainage System
  •  Soil Nail Retaining Walls
  •  Curbing & Sidewalk
  •  Asphalt Paving

Project Manager Brett Fischer. Project Engineer Jeff Kurtin. Project Superintendent Mike Mc Daniel.

Concrete Structure Foreman Bill Wright and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.


Fort Huachuca FY07 Military Family Housing: Client-Sundt

The scope of our work is.                                                                                             

  •  Curbing & Sidewalk Scuppers
  •  Asphalt Paving

Project Manager Allen Sheppard. Project Engineer Travis Whelan. Project Superintendent Bobby Darby.

Concrete Foreman's are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.


Fort Huachuca: Client-US Army

NAC Construction has a 5 year Job Order Contract.

The scope of our work is.                                                                                             

  •  Earthwork Grading -
  •  Storm Water Pollution Control/Maintenance
  •  Storm Water Drainage System
  •  Curbing & Sidewalk
  •  Asphalt Removal & Paving

Project Manager Brett Fischer. Project Engineer Travis Whelan. Project Superintendent Bobby Darby.

Concrete Foreman's are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.


The Pines II Subdivision: Client-Standard Pacific Homes

The Pines II is located in Tucson. This project is a 265 lot single family home sub-division.

The scope of our work is.                                                                                             

  •  Earthwork Grading - 150,000 CY Import
  •  Storm Water Pollution Control/Maintenance
  •  Storm Water Drainage System
  •  All Underground Utilities
  •  Curbing, Sidewalk & Concrete Box Culverts
  •  Asphalt Paving

Project Manager Allen Sheppard. Project Engineer Jeff Kurtin. Project Superintendent Mike McDaniel & Jesse Pantoja. Underground Foreman Henry Larson.

Concrete Foreman's are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.


Fourth Ave Underpass: Client-Sundt for City of Tucson

NAC Construction is a subcontractor of Sundt.

The scope of our work is.                                                                                             

  •  Relocating Existing Water System
  •  Sewer Main
  •  Storm Drain

Project Manager Allen Sheppard. Project Engineer Travis Whelan. Project Superintendent Andy Cota.

Concrete Foreman's are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.


 

 

[Home] [Employment] [Current Projects] [Finished Projects] [Project Photos] [NAC FAQ] [NAC Construction Search Page] [NAC Project Plans]

General Contractors License Number ROC143652 KA Dual Engineering.
Certified DBE, WBE and Federal 8a.
Send mail to Internet Developement with questions or comments about this web site.
Copyright © 2008 NAC Construction A Division of Colorado River Materials, Inc.
Last modified: 07/12/08